PLATEflow provided the perfect solution when Caol Primary School were looking for an urgent hot water solution.
BACKGROUND
The Primary Schools’ existing calorifer was leaking after being incorrectly installed and after a discussion with EMAC Energy Ltd, part of EMAC Engineering, it was also discovered that it was also massively oversized at 3000 Litres!
SOLUTION
After gathering further information on usage, types and flow rates of outlets, a 1000 Litre Copper PLATEflow was specified as it was the perfect fit for their requirements.
The PLATEflow is part of our commercial water heater range and is designed to supply hot water in situations where demand can vary over the course of a day, making it the perfect solution for the Primary School. The PLATEflow system comprises a brazed plate heat exchanger, prepiped and mounted on a buffer vessel. The PLATEflow system effectively decreases the amount of stored hot water required, whilst still delivering peak flow rates as demanded.
The copper cylinder had a shell max
working pressure of 3 bar and comprised of a 100kW Brazed Plate Heat Exchanger, to allow for a constant flow rate of 0.43litres/sec, charging pump & associated pipework and valves, with 2no. 100mm temperature and 1no. pressures gauges, DN25 Anti Vacuum valve. The store was also fitted with 3no. 6kW WR Type immersion heaters, with inspection manhole for easy access for maintenance. The cylinder was insulated with 80mm of rockwool and finished with a galvanised cladding.
Our focus at McDonald Water Storage is very much on the manufacture of copper hot water cylinders and tanks. Copper provides many fantastic benefits including the ability to kill 99% of bacteria including Ecoli and Legionella, it is one of the most efficient heat conductors, it’s significantly more flexible for manufacturing that other materials and has a fanstastically long lifespan due to its natural resistance to corrosion. It is also 100% recycleable making it much more eco friendly than other materials.
Click here to see our full range of commercial hot water solutions.
Caol Primary School is situated in the village of Caol on the shores of Loch Linnhe. Surrounded by Highland mountains and glens with stunning views of Ben Nevis from the classroom windows.
TESTIMONIAL
Simon Brass from EMAC Energy Ltd said:
The PLATEflow arrived in good time and as per specification. All accessories were delivered and installed without any issues.